Featured Transportation
/ Highways and Bridges Projects:
Central Artery / Tunnel Project, Boston
MA
C09A7 - Excavation Support: I-90
Marine Tunnel
General Contractor: Cashman PKA
Completion Date: September 2000
Renovations of the existing South Station Postal Underground
Parking Garage, Construction of Ramp L and all conduit and
duct systems leading to the submersed tunnel tubes connecting
to Logan International Airport. A site lighting and power
system was designed, installed and is currently being maintained.
C09A4 - I-93/I-90 Interchange:
I-95 Northbound
General Contractor: SIWP Slattery, Interbaton, JF White, Perini
Completion Date: October 2002
A City Lights Electrical Company - Norfolk Electric Company
Joint Venture. The project has been divided into two sections.
The first is the construction of three sections of tunnel
to be jacked under the existing railroad tracks at South Station.
The second segment is the support of installation for the
elevated concrete viaducts now being installed from the South
East Expressway through the South Station rail yard connecting
the tunnels. The extensive conduit systems installed within
the viaducts and tunnels include: 15 kV and 480 volt power,
communications, antenna, fire alarm, lighting, and traffic
C17A1 - Congress to High Street
General Contractor: Modern Continental
Completion Date: July 2002
Construction of the North Bound Central Artery Tunnel from
Congress Street to Broad Street, and South Bound from High
Street to Oliver Street. The main scope of our work is to
install an interim power system for the entire site, relocate
traffic systems, and the installation of all electrical conduits
and duct bank systems for the new tunnel.
C22A2 - I-93/I-90 - Integrated
Process Control Systems
Lead Contractor: Honeywell Technology Solutions, Inc.
Completion Date: July 2005
Additional Central Artery / Tunnel
Project Work:
C19E1 - I-93 Leverett Circle
C19E7 - Storrow Drive Connector Ramps
C22A1 - Furnish/Install Integrated Process Control Systems
C15A1 - I-93 to Chardon Street
C09A8 - Broadway Bridge Project
C18B1 - Dewey Square Power System Modifications
C20A2 - I-90 Electrical General Contract
C19B7 - Utility Relocation - North of Charles Street
C19D3 - Storrow Drive Connector Bridge
C19E5 - Utility Relocations at Leverett Circle
|
|