Experience > Project Portfolio > Transportation Services > Transit

Featured Transportation / Transit Projects:

Station Modifications

MBTA Contract: J70CN01
General Contractor: City Lights Electrical Co., Inc.
Completion Date: January 2001
City Lights Electrical was the General Contractor on this project. The scope of work included: site work, sign structure fabrication, variable message sign installation, fiber optic cabling, Fiber terminations, certified testing of fiber optic cabling, concrete work, and the installation of CES Bungalows.

Woburn Regional Transportation Center
MPA Contract: 1.727
General Contractor: The Middlesex Corporation
Completed: 2001
Construction of a new MBTA Commuter Rail facility consisting of station building, platform & Parking Areas. Installed systems include: lighting, power, public address, passenger assistance intercoms, CCTV, fire alarm and LED message signs.

Blue Line Track, Signal & Power Relocation
MBTA Contract: T12CN01
General Contractor: JF White
Completed: December 2001
Relocation of track, signals, traction power cables & switches, and overhead contact system
under service to allow for construction of the new Blue Line Airport Passenger Station.

Aquarium Traction Power Substation/Vent Shaft
MBTA Contract: S00CN05
General Contractor: Walsh Northeast
Completion Date: On-going
Construction of a new traction power substation and vent shaft for the MBTA Blue Line.

Emergency Repairs to MBTA Green Line Kenmore Station
General Contractor: Modern Continental
Completed: 1997
Emergency repairs of lighting, power & communication systems at Kenmore Station after the flood of MBTA Green Line Subway Tunnel.

Cleveland Circle Rail Replacement
MBTA Contract: T1CN13
General Contractor: Modern Continental
Completed: 1996
Installation of signal and power bonding during complete rail replacement by the general contractor under service.

Neponset River Bridge
MBTA Contract: C4CN06
General Contractor: Modern Continental
Completed: 1995
Installation of a conduit system and steel support structures for various MBTA electrical systems along side bridge structure.

South Bay Undercrossing
MBTA Contract: C4CN04
General Contractor: M. DeMatteo
Completed: 1996
Relocation of traction power, signal, communications and contact rail systems to allow for construction of an underpass tunnel for the new MBTA Old Colony Line Commuter Rail.

South Bay Complex
MBTA Contract: C3CN06
General Contractor: JF White
Completion Date: 1997
Modifications to the existing traction power and signal system to allow for the construction of the new Broadway Bridge. The construction activities included: relocation of contact rail gaps, traction power cable, signal cable and wayside signal equipment.

Old Colony Plymouth Line
MBTA Contract: C4CN11
General Contractor: JF White
Completion Date: 1997
Installation of grade crossing, bridge and station underground conduit systems, in Braintree, Plymouth and Kingston MA. In addition, construction of an MBTA 23KV Substation located in Kingston, MA including: underground conduit and cabling, grounding grid and installation of switchgear equipment.

Savin Hill Flyover and Anderson Bridge
MBTA Contract: T6CN02
General Contractor: M. Track Enterprises
Completion Date: 1995
Support for track renovations under service including the installation of the following: contact rail & insulators, traction power, signal and communications cable, contact rail heater system and traction power disconnect switches.

 
     
     
 

 

 
   
   
  City Lights Electrical Company Inc.
phone: 617.822.3300
email: info@citylightselectrical.com
   
Member
National Electrical Contractors Association
  Copyright © 2005, City Lights Electrical Co., Inc.|
All Rights Reserved
  Home | Services | Experience | Safety | News | About Us | Contact
Privacy Policy | Site Map